<< Click to Display Table of Contents >> Navigation: Modules > Tailings Deposition Module > Deposition Modelling > Deposition Embankment > Generation |
Develop Centreline or Downstream Deposition Embankments, either:
•Manually; or
•Automatically when running a model during Downstream or Centreline Cyclone Deposition:
oUnderflow material is directed to the embankment until the embankment fill volume is achieved.
oOnce an embankment is full tailings is directed to the tailings storage basin.