Generation

<< Click to Display Table of Contents >>

Navigation:  Modules > Tailings Deposition Module > Deposition Modelling > Deposition Embankment >

Generation

Develop Centreline or Downstream Deposition Embankments, either:

Manually; or

Automatically when running a model during Downstream or Centreline Cyclone Deposition:

oUnderflow material is directed to the embankment until the embankment fill volume is achieved.

oOnce an embankment is full tailings is directed to the tailings storage basin.