<< Click to Display Table of Contents >> Navigation: Modules > Tailings Deposition Module > Deposition Modelling > Results > Deposition Results > Raise Results > Output Fields |
Raise Result Output fields comprises:
•Date/Time:
oDeposition End Date
oFill Time
•Elevation:
oRate of Rise: The maximum deposition point rate of rise per year
oMaximum Deposition Elevation
oMinimum Beach Head (cyclone deposition - cyclone beach toe)
oMaximum Beach Head (cyclone deposition - cyclone beach toe)
•Beachhead:
oCyclone Beachhead
oSub-aerial Beachhead
oSub-aqueous Beachhead
•Beach Length: Maximum beach length calculated during the deposition raise
oCyclone Beach Length (plan/horizontal length)
oSub-aerial Beach Length (plan/horizontal length)
oSub-aqueous Beach Length (plan/horizontal length)
•Deposition Area:
oThe Deposition Area is the plan deposition area for the deposition raise
oThe total deposition area may exceed this as:
▪Some deposition vectors may be inactive
▪Deposition points may move in space, affecting the deposition area
•Deposition Volume:
oCyclone Volume
oSub-Aerial Volume
oSub-Aqueous Volume
oRaise Volume: The sum of the Sub-Aerial and Sub-Aqueous Volumes
oCumulative Volume
•Deposition Tonnage:
oPercent Underflow (only relevant to upstream cyclone deposition)
oCyclone Tonnage
oSub-Aerial Tonnage
oSub-Aqueous Tonnage
oTotal Tonnage (Sum of the Sub-Aerial and Sub-Aqueous Tonnages)
oCumulative Tonnage
•Pond:
oElevation
oPlan Area
oBasin Slope Area
oVolume
To view the deposition results for each deposition vector (point) use the Result Detail Form.