Output Fields

<< Click to Display Table of Contents >>

Navigation:  Modules > Tailings Deposition Module > Deposition Modelling > Results > Deposition Results > Raise Results >

Output Fields

Raise Result Output fields comprises:

Date/Time:

oDeposition End Date

oFill Time

Elevation:

oRate of Rise: The maximum deposition point rate of rise per year

oMaximum Deposition Elevation

oMinimum Beach Head  (cyclone deposition - cyclone beach toe)

oMaximum Beach Head (cyclone deposition - cyclone beach toe)

Beachhead:

oCyclone Beachhead

oSub-aerial Beachhead

oSub-aqueous Beachhead

Beach Length: Maximum beach length calculated during the deposition raise

oCyclone Beach Length (plan/horizontal length)

oSub-aerial Beach Length (plan/horizontal length)

oSub-aqueous Beach Length (plan/horizontal length)

Deposition Area:

oThe Deposition Area is the plan deposition area for the deposition raise

oThe total deposition area may exceed this as:

Some deposition vectors may be inactive

Deposition points may move in space, affecting the deposition area

Deposition Volume:

oCyclone Volume

oSub-Aerial Volume

oSub-Aqueous Volume

oRaise Volume: The sum of the Sub-Aerial and Sub-Aqueous Volumes

oCumulative Volume

Deposition Tonnage:

oPercent Underflow (only relevant to upstream cyclone deposition)

oCyclone Tonnage

oSub-Aerial Tonnage

oSub-Aqueous Tonnage

oTotal Tonnage (Sum of the Sub-Aerial and Sub-Aqueous Tonnages)

oCumulative Tonnage

Pond:

oElevation

oPlan Area

oBasin Slope Area

oVolume

To view the deposition results for each deposition vector (point) use the Result Detail Form.